CASES
23/05/2023,Senegal
The Senegal customer’s high-end welded pipe production line was successfully put into operation. Our engineers personally guided the local workers to operate it.

27/03/2025,China
An overseas customer ordered a high-end welded pipe production line. Our workers are loading the equipment into the container.
21/03/2025
An overseas customer ordered a new device and we are looking forward to receiving feedback from the customer in two months.
15/03/2025,Senegal
The second high-frequency welded pipe production line of the Senegal customer has also been successfully operated. Thank you for the trust of the customer and the hard work of our engineers.
14/03/2025,Senegal
When the equipment arrived, our engineers were already in place, and the installation and operation of the assembly line went very smoothly.
09/03/2025,China
The equipment of domestic customers is also running successfully, and communication and transportation are more convenient.
05/02/2025
A steel strip slitting line has been successfully commissioned and is now operational.
16/12/2024
A domestic customer successfully ordered a production line equipment.
15/12/2024
A steel strip slitting line has been successfully commissioned and is now operational.
19/10/2024,China
The domestic customer’s assembly line is running successfully.
19/09/2024
The domestic customer’s assembly line is running successfully.
09/09/2024,China
A high-frequency welded pipe production line with a high cost-effectiveness, low price and fast production.
27/07/2024
An overseas customer ordered a set of assembly line equipment and it is being loaded into the container.
06/07/2024
Another container of equipment has been loaded and is ready to be shipped overseas.
26/04/2024,Morocco
Thanks to the trust of Moroccan customers, we lived up to their expectations and successfully operated a high-frequency welded pipe production line.
10/03/2024
Continuing to load, another container of equipment is being loaded and is ready to be shipped overseas.
22/02/2024,China
The first vehicle equipment after the Chinese New Year was sent to domestic customers.
20/01/2024
The first order of the new year 2024 was sent to domestic customers.
31/12/2023,China
We are busy until the last day of 2023. Thank you for your trust.
20/11/2023
A truckload of equipment is ready to be shipped abroad.
09/11/2023,China
Today, three sets of equipment were sent to three different places in China. I wish my customers all get rich.
14/10/2023
We will protect the equipment by film coating and firmly fix it in the container, ready to be shipped overseas.
29/09/2023
The equipment of domestic customers can arrive at the factory the next day.
09/09/2023
Continue to ship, thank you for the trust of domestic customers.

26/08/2023
Our engineers will personally install and debug the equipment until the assembly line can run normally.

23/08/2023
We will protect the equipment with film, pack it on pallets, and firmly fix it in the container to ensure that the equipment arrives safely and smoothly in the hands of foreign customers.
11/08/2023
A truckload of equipment was sent to domestic customers.
07/06/2023
The customer’s assembly line has been running for a while and has started selling pipes normally.
15/05/2023
The customer’s equipment has arrived at his factory and we are ready to unload and assemble the assembly line.
25/04/2023
Loading equipment ordered by domestic customers.
11/04/2023
This set of assembly line equipment has been ordered by the customer and is ready to be disassembled and loaded for shipment.
09/04/2023
Engineers come to your site to assemble the production line.
28/03/2023
The cost performance of second-hand equipment is really high, and it is the first choice for opening a factory.
26/03/2023
A large number of second-hand equipment, there is no best, only the most suitable for you.

12/03/2023
A set of iron pipe straightening equipment was sent to Guilin, Guangxi.
07/03/2023
Our engineers assemble the equipment at the customer’s factory
04/03/2023
Customers from Tangshan watched the production line officially start operating on site. We thank our customers for their trust and support.
25/02/2023
Another truckload of equipment is ready to be shipped to the customer’s factory.
22/02/2023
After the customer inspects the equipment on site, we arrange for loading and shipment.
20/02/2023
The new equipment was favored by the customer and was ready to be disassembled and loaded.

11/02/2023
A large number of second-hand equipment is definitely the first choice for your factory.
14/01/2023
A large number of high-frequency welded pipe production line equipment are waiting for you to choose.
31/12/2022
Our engineers are repairing and debugging equipment.
08/12/2022
Two trucks of equipment departed from the warehouse and were sent to customers.
30/11/2022
We are very professional in high-frequency welded pipe assembly lines. Tell us your needs and we will help you find the most suitable equipment.
29/05/2022
Congratulations to the customer for the successful commissioning of the high-frequency welded pipe production line. Finished products can be seen coming out continuously.
27/05/2022
A truckload of equipment was sent to a customer in Shandong.
27/05/2022
A truckload of equipment was sent to a customer in Yunnan.
26/05/2022
Our engineers are assembling a high-frequency welded pipe production line for our customers.
25/05/2022
The high-frequency welded pipe production line has been successfully operated and has been praised by customers. Thank you for your trust.

18/05/2022
The successful operation of the equipment is our most important task.