CASES

23/05/2023,Senegal

The Senegal customer’s high-end welded pipe production line was successfully put into operation. Our engineers personally guided the local workers to operate it.

27/03/2025,China

An overseas customer ordered a high-end welded pipe production line. Our workers are loading the equipment into the container.

21/03/2025

An overseas customer ordered a new device and we are looking forward to receiving feedback from the customer in two months.

15/03/2025,Senegal

The second high-frequency welded pipe production line of the Senegal customer has also been successfully operated. Thank you for the trust of the customer and the hard work of our engineers.

14/03/2025,Senegal

When the equipment arrived, our engineers were already in place, and the installation and operation of the assembly line went very smoothly.

09/03/2025,China

The equipment of domestic customers is also running successfully, and communication and transportation are more convenient.

05/02/2025

A steel strip slitting line has been successfully commissioned and is now operational.

16/12/2024

A domestic customer successfully ordered a production line equipment.

15/12/2024

A steel strip slitting line has been successfully commissioned and is now operational.

19/10/2024,China

The domestic customer’s assembly line is running successfully.

19/09/2024

The domestic customer’s assembly line is running successfully.

09/09/2024,China

A high-frequency welded pipe production line with a high cost-effectiveness, low price and fast production.

27/07/2024

An overseas customer ordered a set of assembly line equipment and it is being loaded into the container.

06/07/2024

Another container of equipment has been loaded and is ready to be shipped overseas.

26/04/2024,Morocco

Thanks to the trust of Moroccan customers, we lived up to their expectations and successfully operated a high-frequency welded pipe production line.

10/03/2024

Continuing to load, another container of equipment is being loaded and is ready to be shipped overseas.

22/02/2024,China

The first vehicle equipment after the Chinese New Year was sent to domestic customers.

20/01/2024

The first order of the new year 2024 was sent to domestic customers.

31/12/2023,China

We are busy until the last day of 2023. Thank you for your trust.

20/11/2023

A truckload of equipment is ready to be shipped abroad.

09/11/2023,China

Today, three sets of equipment were sent to three different places in China. I wish my customers all get rich.

14/10/2023

We will protect the equipment by film coating and firmly fix it in the container, ready to be shipped overseas.

29/09/2023

The equipment of domestic customers can arrive at the factory the next day.

09/09/2023

Continue to ship, thank you for the trust of domestic customers.

3b9ff41348c4fa05a1614c4cdbbac7a

26/08/2023

Our engineers will personally install and debug the equipment until the assembly line can run normally.

6164550f1cc299aca4ecce4a1bb4b92

23/08/2023

We will protect the equipment with film, pack it on pallets, and firmly fix it in the container to ensure that the equipment arrives safely and smoothly in the hands of foreign customers.

11/08/2023

A truckload of equipment was sent to domestic customers.

07/06/2023

The customer’s assembly line has been running for a while and has started selling pipes normally.

15/05/2023

The customer’s equipment has arrived at his factory and we are ready to unload and assemble the assembly line.

25/04/2023

Loading equipment ordered by domestic customers.

11/04/2023

This set of assembly line equipment has been ordered by the customer and is ready to be disassembled and loaded for shipment.

09/04/2023

Engineers come to your site to assemble the production line.

28/03/2023

The cost performance of second-hand equipment is really high, and it is the first choice for opening a factory.

26/03/2023

A large number of second-hand equipment, there is no best, only the most suitable for you.

de36ba0aeafc43e49880f6c4ce34b71

12/03/2023

A set of iron pipe straightening equipment was sent to Guilin, Guangxi.

07/03/2023

Our engineers assemble the equipment at the customer’s factory

04/03/2023

Customers from Tangshan watched the production line officially start operating on site. We thank our customers for their trust and support.

25/02/2023

Another truckload of equipment is ready to be shipped to the customer’s factory.

22/02/2023

After the customer inspects the equipment on site, we arrange for loading and shipment.

20/02/2023

The new equipment was favored by the customer and was ready to be disassembled and loaded.

6b97503c683e8d8cb7cb9a047cf7dc5

11/02/2023

A large number of second-hand equipment is definitely the first choice for your factory.

14/01/2023

A large number of high-frequency welded pipe production line equipment are waiting for you to choose.

31/12/2022

Our engineers are repairing and debugging equipment.

08/12/2022

Two trucks of equipment departed from the warehouse and were sent to customers.

30/11/2022

We are very professional in high-frequency welded pipe assembly lines. Tell us your needs and we will help you find the most suitable equipment.

29/05/2022

Congratulations to the customer for the successful commissioning of the high-frequency welded pipe production line. Finished products can be seen coming out continuously.

27/05/2022

A truckload of equipment was sent to a customer in Shandong.

27/05/2022

A truckload of equipment was sent to a customer in Yunnan.

26/05/2022

Our engineers are assembling a high-frequency welded pipe production line for our customers.

25/05/2022

The high-frequency welded pipe production line has been successfully operated and has been praised by customers. Thank you for your trust.

18/05/2022

The successful operation of the equipment is our most important task.